https://autode.sk/2MHi1FF
top of page

Development of survey and executive project for Dollar City stores.

Project

Location: Guadalajara, Jalisco, Mexico.

Project scope:

  • Survey of existing conditions using 3D laser scanning with point cloud technology (LIDAR).

Generation of accurate As-Built models for each store.

  • Development of the multidisciplinary executive project, including: Electrical engineering, Air conditioning system (HVAC), Hydrosanitary system.

  • Comprehensive application of the BIM methodology for project modeling, coordination, and documentation.

  • Implementation of BIM coordination processes using: Autodesk Construction Cloud for document management, collaborative review, and cloud-based tracking.

  • Navisworks for the detection and analysis of interferences between disciplines.

  • Integration of technical criteria and construction processes to facilitate on-site execution.

Schedule

From Monday to Friday from 8:00 a.m. - 6:00 p.m.

Saturdays from 8:00 a.m. - 1:00 p.m.

  • Tik Tok
  • YouTube - círculo blanco
  • WhatsApp
  • LinkedIn - círculo blanco
  • Facebook - White Circle
  • Instagram - White Circle

Franz Liszt 5293, La Estancia, 45030. México

Los Ángeles, California. 939 S Downey Rd

Telephone: +52 56 4968 4657

E-mail: gerencia@gruposohersa.com

© Sohersa 2024 All Rights Reserved.

bottom of page