Television Forum for TV Azteca
Project
In this project, Sohersa BIM is responsible for the complete development of the MEP installations, including air conditioning, electrical, plumbing, fire protection, and special systems.
All work is carried out using a comprehensive approach based on the BIM methodology, which has been key to achieving precise coordination between disciplines and ensuring interference-free execution. Through BIM modeling, digital models are generated with detailed information that allow for:
-
Extract approved construction plans based on updated model data.
-
Detect and resolve conflicts between disciplines before arriving on site.
-
Validate design criteria, review constructability, and optimize processes.
-
Ensure compliance with international standards such as ISO 19650.
-
In a television studio, where a large number of technical systems, audiovisual equipment, air conditioning, and power distribution coexist, BIM coordination is essential to ensure that all elements work together correctly, avoiding costly errors and rework.
Our collaborative approach, based on cutting-edge technology, ensures that the project meets the high technical standards required for a television production.